Advanced APS — Master Production Schedule (how to use)

← Back to Advanced APS overview

Master Production Schedule

Module: Advanced APS

Where to open in admin

  1. Log in to Admin.
  2. Open sidebar menu Advanced APS.
  3. Click Master Production Schedule.
  4. Direct route (for admins): admin/advanced_aps/advanced_aps_mps

What this screen is for

Manufacturing and inventory costing integration with GL.

How to use — step by step

  1. Ensure Manufacturing / Inventory modules are active.
  2. Map WIP, FG, and variance accounts in settings.
  3. Post production receipts and material issues from manufacturing.
  4. Run costing/WIP reports and reconcile to work orders.

Common buttons & actions

  • Post WIP
  • Run costing report
  • Reconcile WO

Required permissions

Staff need the aps_mps feature with: view, create, edit, delete.

Assign under Setup → Staff → Roles → Permissions.

Related guides

See the Advanced APS overview for module-wide workflows, API, and setup.

Did you find this article useful?